Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
City of Vergennes
|
|
|
CSO Structure #002 Macdonough Dr Pump Station
|
|
|
12/22/2018
|
|
|
12/22/2018
|
|
|
05:30 am to 09:00 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
30,000
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek below the falls in Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on December 22, 2018 resulted in the discharge of a combination of sewage and stormwater from CSO#002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
0.87 inches of rain in 24 hrs.
|
|
|
|
|
|
HNK-85DH-9GGJB
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|