Facility Name:
|
Vergennes
|
Caller Name And Title:
|
Rick Chaput, Chief Operator
|
Municipality:
|
City of Vergennes
|
Location (street or site):
|
CSO Structure #002 Macdonough Dr Pump Station
|
Incident Start Date:
|
12/22/2018
|
Incident End Date:
|
12/22/2018
|
Incident Start End Times:
|
05:30 am to 09:00 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
30,000
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
None
|
Waterbody Impacted:
|
Otter Creek below the falls in Vergennes
|
Contact Name And Title For Public:
|
Rick Chaput, Chief Operator
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on December 22, 2018 resulted in the discharge of a combination of sewage and stormwater from CSO#002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
0.87 inches of rain in 24 hrs.
|
|
|
nForm Submission Number:
|
HNK-85DH-9GGJB
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|