Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
Vergennes
|
|
|
Macdonough Drive Pumping Station below the falls in Vergennes
|
|
|
05/04/2018
|
|
|
05/04/2018
|
|
|
08:40 pm to 10:00 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
23,000
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Otter Creek
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on May 4th 2018 resulted in the discharge of a combination of sewage and stormwater from CSO 001. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HND-JGP2-7BSC7
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|