Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Vergennes    
Rick Chaput, Chief Operator    
Vergennes    
Macdonough Drive Pumping Station below the falls in Vergennes    
05/04/2018    
05/04/2018    
08:40 pm to 10:00 pm    
   
Authorized Wet Weather CSO Overflow    
23,000    
High Flows    
   
Combined sewer overflow structure    
none    
Otter Creek    
Rick Chaput, Chief Operator    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on May 4th 2018 resulted in the discharge of a combination of sewage and stormwater from CSO 001. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HND-JGP2-7BSC7