|
Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
City of Vergennes
|
|
|
Otter Creek
|
|
|
01/12/2018
|
|
|
01/13/2018
|
|
|
08:30 am to 03:45 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
743,600
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on January 12, 2018 resulted in the discharge of a combination of sewage and stormwater from CSO S/N002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNA-SSTW-M7CWB
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|