|
Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
Vergennes
|
|
|
Macdonough Drive Pump Station
|
|
|
08/12/2017
|
|
|
08/12/2017
|
|
|
06:30 pm to 10:00 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
111,700
|
|
|
High Flows
|
|
|
NA
|
|
|
Pump station emergency overflow pipe
|
|
|
None
|
|
|
Otter Creek below the falls in Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on August 12 2017 resulted in the discharge of a combination of sewage and stormwater from CSO 001. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HN7-1TF5-C17BK
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|