|
Facility Name:
|
Vergennes
|
|
|
Rick Chaput Chief Operator City of Vergennes
|
|
|
City of Vergennes
|
|
|
Macdonough Dr. pump station
|
|
|
06/05/2016
|
|
|
06/05/2016
|
|
|
07:20 pm to 07:30 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
1300
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Big Otter Creek below falls in Vergennes
|
|
|
Rick Chaput Chief Operator City of Vergennes
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on June 5th 2016 resulted in the discharge of a combination of sewage and storm water from CSO 001 Macdonough Dr. pump station. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
2G5-57BK-SH19
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|