Facility Name:
|
Vergennes
|
|
|
Rick Chaput Chief Operator
|
|
|
City of Vergennes
|
|
|
Macdonough Dr. Pump Station
|
|
|
03/10/2016
|
|
|
03/10/2016
|
|
|
07:45 pm to 10:15 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
5200
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek South of falls in Vergennes
|
|
|
Rick Chaput Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on March 10th 2016 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|