|
Facility Name:
|
Vergennes
|
|
|
Rick Chaput Chief Operator
|
|
|
Vergennes
|
|
|
Macdonough Dr. Pump Station below falls in Vergennes
|
|
|
01/10/2016
|
|
|
01/10/2016
|
|
|
05:45 pm to 09:45 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
92400
|
|
|
High Flows
|
|
|
NA
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Rick Chaput Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on January 10, 2016 resulted in the discharge of a combination of sewage and stormwater from the Macdonough Dr. Pump Station . This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
Rainfall 0.61"
|
|
|
|
|
|
2CG-C1X8-D9NR
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|