Facility Name:
|
Vergennes
|
Caller Name And Title:
|
Rick Chaput, Chief Operator
|
Municipality:
|
Vergennes
|
Location (street or site):
|
MacDonough Drive Pump Station
|
Incident Start Date:
|
06/23/2015
|
Incident End Date:
|
06/23/2015
|
Incident Start End Times:
|
7:00 AM - 2:45 PM
|
Estimated Duration Of Event:
|
7.75 hours
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
262000
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Combined Sewer Overflow Structure
|
Corrective Action Taken:
|
The operator checked the pump station's two pumps during the overflow event to ensure proper operation and maximum pumping capacity.
|
Waterbody Impacted:
|
Potash Brook & Otter Creek
|
Contact Name And Title For Public:
|
Rick Chaput, Chief Operator
|
Call Date:
|
06/24/2015
|
WW Staff Called:
|
Liz Dickson
|
Type Of Notification:
|
E-Mail
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
A rain event on June 23, 2015 resulted in high flows to the pump station and an overflow. Vergennes' Discharge Permit authorizes Combined Sewer Overflows during storm events from this pump station. It is estimated that of the total volume of 262,000 gallons that overflowed, that 20% or 52,400 gallons was untreated sewage.
|
|
|