Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
Vergennes
|
|
|
MacDonough Drive Pump Station
|
|
|
06/09/2015
|
|
|
06/10/2015
|
|
|
4:00 AM; 5:00 AM
|
|
|
25 hours
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
189600
|
|
|
High Flows
|
|
|
|
|
|
Combined Sewer Overflow Structure
|
|
|
The operators checked the pump station's two pumps during the overflow event to ensure proper operation and maximum pumping capacity.
|
|
|
Potash Brook & Otter Creek
|
|
|
Rick Chaput, Chief Operator
|
|
|
06/10/2015
|
|
|
Liz Dickson
|
|
|
E-Mail
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Rain events on June 8 and June 9, 2015 resulted in high flows to the pump station and an overflow. Vergennes' Discharge Permit authorizes Combined Sewer Overflows during storm events from this pump station. The estimated volume is for the sanitary sewer portion of the total recorded overflow.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|