Facility Name:
|
Vergennes
|
|
|
Rick Chaput, Chief Operator
|
|
|
Vergennes
|
|
|
MacDonough Drive Pump Station
|
|
|
05/30/2015
|
|
|
06/01/2015
|
|
|
intermittent
|
|
|
31 hours
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
237280
|
|
|
High Flows
|
|
|
|
|
|
Combined Sewer Overflow Structure
|
|
|
The operators checked the pump station's two pumps during the overflow event to ensure proper operation and maximum pumping capacity.
|
|
|
Potash Brook & Otter Creek
|
|
|
Rick Chaput, Chief Operator
|
|
|
06/02/2015
|
|
|
Liz Dickson
|
|
|
E-Mail
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
A rain fall total of over 3.8 inches from Sat. 6 PM, 5/30 - Mon., 6/1/2015 resulted in high flows to the pump station and an intermittent overflow. Vergennes' Discharge Permit authorizes Combined Sewer Overflows during storm events from this pump station. The estimated volume is for the sanitary sewer portion (20%) of the total recorded overflow.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|