View FacilityIncident Record


Facility Name: Vergennes    
Rick Chaput, Chief Operator    
Vergennes    
MacDonough Drive Pump Station    
01/11/2015    
01/11/2015    
12:00 N - 6:00 PM    
6 hours    
Discharged untreated sewage    
12700    
Mechanical Failure    
   
Pump Station Emergency Overflow Pipe    
The on-call operator checked the pump station and called for assistance on Sunday afternoon (1/11/2015). RCI Electric responded and hard wired a pump. The operators ran the pump manually and pumped down the wet well to the normal operating level, which stopped the overflow. Dundon's Septic responded but was not needed to pump down the wet well. The operators worked shifts Sunday night and Monday (1/12/2015) to operate the pump manually to pump sewage from the pump station to the Vergennes Wastewater Treatment Facility. On Monday, the electrician was working to repair one drive and the operators were installing floats to operate the pumps.    
Potash Brook & Otter Creek    
Rick Chaput, Chief Operator    
01/12/2015    
Liz Dickson    
Phone    
Y    
   
   
   
The heater inside the MacDonough Drive Pump Station tripped out. A copper water pipe then froze, burst, and sprayed the Variable Frequency Drives for the pumps with water until the drives failed. Sewage backed up in the pump station wet well and overflowed.