Facility Name:
|
Shelburne 1 (Crown Rd)
|
Caller Name And Title:
|
Chris Robinson, Water Quality Superintendent
|
Municipality:
|
Shelburne
|
Location (street or site):
|
WWTF#1 - Crown Rd
|
Incident Start Date:
|
07/11/2024
|
Incident End Date:
|
07/11/2024
|
Incident Start End Times:
|
01:30 am to 02:00 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged untreated sewage
|
Estimated Volume (gallons):
|
200
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Manhole
|
Corrective Action Taken:
|
A temporary portable pump and hoses were put in place to assist the raw sewage pumps with pumping down the wetwells.
|
Waterbody Impacted:
|
Munroe Brook
|
Contact Name And Title For Public:
|
Chris Robinson, Water Quality Superintendent
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
Influent pumps could not keep up with the high flows. This caused a backup of the system near the headworks causing a manhole to overflow.
|
|
|
nForm Submission Number:
|
HQ5-1MFJ-33Z4V
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|