Facility Name:
|
Shelburne 1 (Crown Rd)
|
|
|
Chris Robinson, Water Quality Superintendent
|
|
|
Town of Shelburne
|
|
|
WWTF#1 to Munroe Brook
|
|
|
11/01/2019
|
|
|
11/01/2019
|
|
|
01:45 am to 04:45 am
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>1,000 to 10,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Stormwater collection system
|
|
|
All auxiliary pumps were being used within the facility and flow was diverted to the equalization tank until this tank was full.
|
|
|
Munroe Brook
|
|
|
Chris Robinson, Water Quality Superintendent
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
The pumping capacity of the facility was exceeded due to excessive flows. The headworks building overflowed out the door and into a facility stormwater drain that discharges to a drainage ditch behind the facility. This overflow was intermittent during the time specified. It is estimated that approximately 10,000 gallons may have been discharged. The facility recorded four (4) inches of rain in a twelve (12) hour period.
|
|
|
|
|
|