Facility Name:
|
Shelburne 1 (Crown Rd)
|
|
|
Walt Arsenault, Operator WWTF # 1
|
|
|
Shelburne
|
|
|
WWTF # 1
|
|
|
02/22/2018
|
|
|
02/24/2018
|
|
|
04:45 pm to 12:00 am
|
|
|
|
|
|
Discharged treated and partly disinfected effluent
|
|
|
>100,000 to 500,000 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
WWTF outfall
|
|
|
Chlorine delivery ratio was increased on 21 Feb 18. In addition, on 23 Feb 18, two E-coli samples, one from each SBR, will be captured during the decant process, and brought to Endyne Lab for E-coli analysis. Sample results will be relayed to Shelburne wastewater personnel no later than 24 Feb 18.
|
|
|
Lake Champlain
|
|
|
Walt Arsenault
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Rapidly melting snow created high flow conditions that were outside the normal operating parameters of the facility. Increased flows potentially reduced disinfection time in chlorine contact tank. A chlorine residual of 1.30 mg/l was recorded along with the dispensing of 7.8 gallons of chlorine.
|
|
|
|
|
|
HNB-T92G-5P2FH
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|