Facility Name:
|
St Albans City
|
Caller Name And Title:
|
Brian Willett Chief operator
|
Municipality:
|
City Of St. Albans
|
Location (street or site):
|
At the main wastewater plant
|
Incident Start Date:
|
05/22/2024
|
Incident End Date:
|
05/22/2024
|
Incident Start End Times:
|
05:00 am to 07:00 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged partially treated disinfected effluent
|
Estimated Volume (gallons):
|
.234
|
Cause Of Discharge:
|
Mechanical Failure
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
WWTF outfall
|
Corrective Action Taken:
|
The electrician that does work for the city was called in and found the problem and corrected it. During the power outage the bypass was chlorinated and dechlorinated.
|
Waterbody Impacted:
|
Stevens Brook Lake Champlain
|
Contact Name And Title For Public:
|
Marty Manahan Director of Public works.
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
There was a power outage in the area. When the power went out the transfer switch on the generator did not switch over . The Electrician was brought in and the problem was corrected. Between the power outage and the generator issue the power was out for approx. 2 hours. During the power outage the Bypass was Chlorinated and dechlorinated.
|
|
|
nForm Submission Number:
|
HQ3-TDTS-23KJK
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|