Facility Name:
|
St Albans City
|
|
|
Brian Willett Chief operator
|
|
|
City Of St. Albans
|
|
|
At the main wastewater plant
|
|
|
05/22/2024
|
|
|
05/22/2024
|
|
|
05:00 am to 07:00 am
|
|
|
|
|
|
Discharged partially treated disinfected effluent
|
|
|
.234
|
|
|
Mechanical Failure
|
|
|
|
|
|
WWTF outfall
|
|
|
The electrician that does work for the city was called in and found the problem and corrected it. During the power outage the bypass was chlorinated and dechlorinated.
|
|
|
Stevens Brook Lake Champlain
|
|
|
Marty Manahan Director of Public works.
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
There was a power outage in the area. When the power went out the transfer switch on the generator did not switch over . The Electrician was brought in and the problem was corrected. Between the power outage and the generator issue the power was out for approx. 2 hours. During the power outage the Bypass was Chlorinated and dechlorinated.
|
|
|
|
|
|
HQ3-TDTS-23KJK
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|