View FacilityIncident Record


Facility Name: St Albans City    
Brian Willett Chief Operator    
City of St.Albans    
The City Wastewater plant    
12/23/2022    
12/23/2022    
09:30 am to 02:30 pm    
   
Other    
>1,000,000 gallons    
Power Outage    
   
WWTF outfall    
We ran the Sodium Hypochlorite pump as high as we could to try to provide as much Disinfection as we could.    
Stevens Brook Lake Champlain    
Marty Manahan Director of Public Works    
   
   
nForms    
Y    
   
   
   
there was a 5 hour power outage from the wind storm. during the power outage we also had heavy rain at times. We discharged 1.3mg during the power outage. The discharge was reported on the state web site as a separate incident. This report is for the E coli violation that occurred during the power outage.There is a backup generator on site that provides power to some of the ops building and the chemical building. The flow was so high during the power outage that we couldn't feed enough Sodium Hypochlorite for total E coli Kill. The flow was up to 8.0mg at times. The plant went back to normal operation when the power was restored.    
   