|
Facility Name:
|
St Albans City
|
|
|
Brian Willett Chief Operator
|
|
|
City Of St.Albans
|
|
|
Lower welden St. CSO
|
|
|
10/01/2019
|
|
|
10/01/2019
|
|
|
08:00 pm to 09:00 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100,000 to 500,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Stevens Brook Lake Champlain
|
|
|
Marty Manahan Director of public works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High Flows caused by an intense rain storm on 10-1-19 which resulted in the discharge of sewage and storm water from the lower Welden St. CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNT-75CR-799C2
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|