Facility Name:
|
St Albans City
|
Caller Name And Title:
|
Brian Willett Chief Operator
|
Municipality:
|
City of St.Albans
|
Location (street or site):
|
Lower Welden st. CSO
|
Incident Start Date:
|
08/08/2019
|
Incident End Date:
|
08/08/2019
|
Incident Start End Times:
|
09:03 am to 10:00 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
>100,000 to 500,000 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
none
|
Waterbody Impacted:
|
Stevens Brook Lake Champlain
|
Contact Name And Title For Public:
|
Marty Manahan Director of Public Works
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by intense rain storm on 8-8-19 resulted in the discharge of a combination of sewage and storm water from CSO on lower Welden St. This is an authorized discharge intended to protect the sewer system to prevent overflows into homes and buildings
|
|
|
nForm Submission Number:
|
HNR-W620-EQY3Z
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|