|
Facility Name:
|
St Albans City
|
|
|
Brian willett chief operator
|
|
|
city of stalbans
|
|
|
lower welden cso
|
|
|
11/03/2018
|
|
|
11/03/2018
|
|
|
02:03 pm to 05:20 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>10,000 to 100,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
Over flow stopped on its own after flow dropped off
|
|
|
stevens brook lake champlain
|
|
|
Marty Manahan interim public works director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
we had heavy rain that caused the CSO to over flow
|
|
|
|
|
|
HNJ-1ZCY-PEMCC
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|