Facility Name:
|
St Albans City
|
Caller Name And Title:
|
Brian Burns Superintendent
|
Municipality:
|
Stalbans City
|
Location (street or site):
|
Lower weldon CSO
|
Incident Start Date:
|
06/24/2017
|
Incident End Date:
|
06/24/2017
|
Incident Start End Times:
|
02:00 am to 03:30 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
>100,000 to 500,000 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
None
|
Waterbody Impacted:
|
Stevens Brook
|
Contact Name And Title For Public:
|
Allen Robtoy
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on (6/24/2017) resulted in the discharge of a combination of sewage and stormwater from CSO (Lower Weldon St). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
nForm Submission Number:
|
HN5-V138-TCBDD
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|