|
Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab. Director
|
|
|
City of Rutland
|
|
|
CSO # 3 - School Street & CSO # 4 - Meadow Street - Combined - Third Base, Ball
|
|
|
06/07/2026
|
|
|
06/07/2026
|
|
|
01:03 pm to 01:39 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
50400
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Robert Protivansky, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by a steady rain that fell at a maximum rate of 0.43 inches per hour, and with a total accumulation of 0.58 inches on 6/7/2026 resulted in the discharge of a combination of sewage and stormwater from CSO # 3 - School Street & CSO # 4 - Meadow Street - Combined - Third Base, Ball Field. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQP-4XNN-BWE11
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|