Facility Name: Rutland    
Mark Breznick / Lab. Director    
City of Rutland    
CSO # 1 - Calvary Cemetery    
10/08/2025    
10/08/2025    
03:17 am to 06:14 am    
   
Authorized Wet Weather CSO Overflow    
712064    
High Flows    
None    
Combined sewer overflow structure    
None    
Otter Creek    
Robert Protivansky, Commissioner of Public Works    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm with a maximum rate of 3.15 inches per hour, and a total accumulation of 1.64 inches on 10/8/2025 resulted in the discharge of a combination of sewage and storm water from CSO # 1 - Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   