Facility Name:
|
Rutland
|
Caller Name And Title:
|
Mark Breznick, Lab. Director
|
Municipality:
|
City of Rutland
|
Location (street or site):
|
CSO # 2 - Home Plate, Ball Field
|
Incident Start Date:
|
07/20/2025
|
Incident End Date:
|
07/20/2025
|
Incident Start End Times:
|
04:13 pm to 04:42 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
20300
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
None
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
None
|
Waterbody Impacted:
|
East Creek
|
Contact Name And Title For Public:
|
Robert Protivansky, Commissioner of Public
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by an intense storm with rain that fell at a maximum rate of 2.31 inches per hour, a total accumulation of 0.47 inches resulted in the discharge of a combination of sewage and storm water from CSO # 2 - Home Plate, Ball Field on 7/20/2025. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
nForm Submission Number:
|
HQE-8A53-5N3CP
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|