Facility Name:
|
Rutland
|
|
|
Mark Breznick, Lab. Director
|
|
|
City of Rutland
|
|
|
CSO # 5 - West Street Siphon
|
|
|
07/20/2025
|
|
|
07/20/2025
|
|
|
03:59 pm to 04:22 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
36800
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Robert Protivansky, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense storm with rain that fell at a maximum rate of 2.31 inches per hour, a total accumulation of 0.47 inches resulted in the discharge of a combination of sewage and storm water from CSO # 5 - West Street Siphon on 7/20/2025. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQE-8AG4-X3F4P
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|