Facility Name:
|
Rutland
|
Caller Name And Title:
|
Mark Breznick / Lab. Director
|
Municipality:
|
City of Rutland
|
Location (street or site):
|
CSO # 1 - Calvary Cemetery
|
Incident Start Date:
|
09/26/2024
|
Incident End Date:
|
09/26/2024
|
Incident Start End Times:
|
11:28 am to 12:38 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
118067
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
None
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
None
|
Waterbody Impacted:
|
Otter Creek
|
Contact Name And Title For Public:
|
Robert Protivansky, Commissioner of Public Works
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by a steady consistent rain of long duration, that fell at a maximum rate of 0.83 inches per hour, and with a total accumulation of 1.02 inches on 9/26/2024 resulted in the discharge of a combination of sewage and storm water from CSO # 1 - Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
nForm Submission Number:
|
HQ6-YFFY-FG8E0
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|