|
Facility Name:
|
Rutland
|
|
|
Tyler Harte, Lab Technician
|
|
|
City Of Rutland
|
|
|
CSO # 2 - Home Plate Ball Field
|
|
|
03/09/2024
|
|
|
03/09/2024
|
|
|
09:02 pm to 10:07 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>10,000 to 100,000 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Robert Protivansky, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm that fell at a maximum rate of 0.24 inches per hour, with a total accumulation of 1.30 inches on (3.9.2024) resulted in the discharge of a combination of sewage and stormwater from CSO # 2 - Home Plate Ball Field . This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQ2-10KY-DSHRD
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|