|
Facility Name:
|
Rutland
|
|
|
Tyler Harte, Lab Techcnician
|
|
|
City of Rutland
|
|
|
CSO # 3- School Street & CSO # 4 - Meadow Street - Combined - Third Base Ball Fi
|
|
|
03/09/2024
|
|
|
03/09/2024
|
|
|
09:02 pm to 10:07 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>10,000 to 100,000 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Robert Protivansky, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm that fell at a maximum rate of 0.24 inches per hour, with a total accumulation of 1.30 inches on (3.9.2024) resulted in the discharge of a combination of sewage and stormwater from CSO # 3 - School Street & CSO # 4 - Meadow Street - Combined - Third Base Ball Field. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQ2-10SF-FVN0Z
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|