Facility Name:
|
Rutland
|
|
|
Tyler Harte, Lab Technician
|
|
|
City of Rutland
|
|
|
CSO # 1 - Calvary Cemetery
|
|
|
08/12/2023
|
|
|
08/13/2023
|
|
|
11:50 pm to 12:14 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>10,000 to 100,000 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Robert Protivansky, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 8-12 to 8-13-2023 resulted in the discharge of a combination of sewage and stormwater from CSO # 1 Calvary Cemetery . This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPW-W1RT-WCTX7
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|