Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab. Director
|
|
|
City of Rutland
|
|
|
CSO # 5 - West Street Siphon
|
|
|
08/04/2023
|
|
|
08/04/2023
|
|
|
03:51 pm to 05:05 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
62,197 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Robert Protivansky, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense storm on 8/4/2023, with a maximum rainfall rate of 16.46 inches per hour, and a total accumulation of 2.88 inches resulted in the discharge of a combination of sewage and storm water from CSO # 5 - West Street Siphon. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPW-N9ZP-T9NY9
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|