Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab. Director
|
|
|
City of Rutland
|
|
|
CSO # 2 - Home Plate, Ball Field
|
|
|
07/15/2023
|
|
|
07/15/2023
|
|
|
01:32 am to 02:46 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
71,016 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Robert Protivansky, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense thunder storm, that had a maximum rainfall rate of 7.02 inches per hour for a short period of time, and with a total accumulation of 0.32 inches on 7/15/2023 resulted in the discharge of a combination of sewage and storm water from CSO # 2 - Home Plate, Ball Field. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPW-5GF2-6MSS2
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|