Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab. Director
|
|
|
City of Rutland
|
|
|
CSO # 3 - School Street & CSO # 4 - Meadow Street - Combined - Third Base, Ball
|
|
|
06/25/2023
|
|
|
06/25/2023
|
|
|
06:57 pm to 08:03 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
34,178 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Robert Protivansky, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by a heavy downpour of short duration, with a total accumulation of only 0.12 inches, but with a maximum rainfall rate of 2.89 inches per hour on 6/25/2023 resulted in the discharge of a combination of sewage and storm water from CSO . This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPV-P7CE-GDHPJ
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|