|
Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab. Director
|
|
|
City of Rutland
|
|
|
CSO # 4 - Meadow Street - Combined - Third Base, Ball Field
|
|
|
01/13/2023
|
|
|
01/13/2023
|
|
|
02:33 am to 08:46 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
33,458 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Jim Rotondo, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by steady rainfall that fell consistently for several hours at a maximum rate of 0.36 inches per hour, and with a total accumulation of 1.54 inches on 1/13/2023 resulted in the discharge of a combination of sewage and storm water from CSO # 4 - Meadow Street - Combined - Third Base, Ball Field. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPQ-NJCQ-RXTMX
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|