Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab. Director
|
|
|
City of Rutland
|
|
|
CSO # 3 - School Street & CSO # 4 - Meadow Street - Combined - Third Base, Ball
|
|
|
04/19/2022
|
|
|
04/19/2022
|
|
|
04:37 am to 06:18 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
37,834 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Jim Rotondo, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by rapid snow melt, and steady rain that reached a maximum rate of 0.40 inches per hour, and a total accumulation of 0.74 inches on 4/19/2022 resulted in the discharge of a combination of sewage and storm water from CSO # 3 - School Street & CSO # 4 - Meadow Street - Combined - Third Base, Ball Field . This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|