Facility Name: Rutland    
Mark Breznick / Lab. Director    
City of Rutland    
CSO # 1 - Calvary Cemetery    
03/19/2022    
03/19/2022    
10:08 pm to 11:45 pm    
   
Authorized Wet Weather CSO Overflow    
220,694 gallons    
High Flows    
None    
Combined sewer overflow structure    
None    
Otter Creek    
Jim Rotondo, Commissioner of Public Works    
   
   
nForms    
Y    
   
   
   
High flows caused by an unusual March Thunderstorm, with heavy rain that accumulated to 0.60 inches on 3/19/2022 resulted in the discharge of a combination of sewage and storm water from CSO # 1 - Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   