|
Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab. Director
|
|
|
City of Rutland
|
|
|
CSO # 1 - Calvary Cemetery
|
|
|
02/18/2022
|
|
|
02/18/2022
|
|
|
02:02 am to 08:57 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
821,694 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Jim Rotondo, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by heavy rain that accumulated to 0.49 inches, along with rapid snow melt caused by unusually warm temperatures on 2/18/2022 resulted in the discharge of a combination of sewage and storm water from CSO # 1 - Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPF-K1VA-4Q9WM
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|