|
Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab. Director
|
|
|
City ofRutland
|
|
|
CSO # 1 - Calvary Cemetery
|
|
|
12/11/2021
|
|
|
12/11/2021
|
|
|
09:49 am to 02:41 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
303,319 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
James Rotondo, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense storm with high winds and heavy rain, that brought a total accumulation of 0.78 inches on 12/11/2021 resulted in the discharge of a combination of sewage and stormwater from CSO # 1 - Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPD-XFDT-Q1D2P
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|