Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Rutland    
Mark Breznick / Lab. Director    
City ofRutland    
CSO # 1 - Calvary Cemetery    
12/11/2021    
12/11/2021    
09:49 am to 02:41 pm    
   
Authorized Wet Weather CSO Overflow    
303,319 gallons    
High Flows    
None    
Combined sewer overflow structure    
None    
Otter Creek    
James Rotondo, Commissioner of Public Works    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense storm with high winds and heavy rain, that brought a total accumulation of 0.78 inches on 12/11/2021 resulted in the discharge of a combination of sewage and stormwater from CSO # 1 - Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HPD-XFDT-Q1D2P