|
Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab. Director
|
|
|
City of Rutland
|
|
|
CSO # 1 - Calvary Cemetery
|
|
|
11/13/2021
|
|
|
11/13/2021
|
|
|
05:10 pm to 07:03 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
240,333 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
James Rotondo, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by heavy rain that had a total accumulation of 0.60 inches on 11/13/2021 resulted in the discharge of a combination of sewage and stormwater from CSO # 1 - Calvary Cemetery . This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPD-7E3C-P31CK
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|