|
Facility Name:
|
Rutland
|
|
|
Tyler Harte,Lab Technician
|
|
|
City of Rutland
|
|
|
Cso#-5 West Street Siphon
|
|
|
08/29/2021
|
|
|
08/29/2021
|
|
|
09:09 am to 09:24 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
7579
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
James Rotondo, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by heavy rain that fell at a rate of 0.20 inches an hour with a total rainfall amount of 0.335 inches on 8-29-21 resulted in the discharge of a combination of sewage and stormwater from CSO # 5- West Street Siphon . This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPB-B18R-55R5X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|