Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Rutland    
Tyler Harte, Lab Technician    
City of Rutland    
Cso# 4- Meadow Street- Third base ball Field    
08/29/2021    
08/29/2021    
09:13 am to 09:40 am    
   
Authorized Wet Weather CSO Overflow    
10654    
High Flows    
None    
Combined sewer overflow structure    
None    
East Creek    
James Rotondo, Comissioner of Public Works    
   
   
nForms    
Y    
   
   
   
High flows caused by heavy rain that fell at a rate of 0.20 inches an hour with a total rainfall amount of 0.335 inches on 8-29-21 resulted in the discharge of a combination of sewage and stormwater from CSO # 4- Meadow Street -combined - third base, ball field . This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HPB-B129-V4WM0