Facility Name:
|
Rutland
|
|
|
Tyler Harte, Lab Technician
|
|
|
City of Rutland
|
|
|
Cso #3 -School street & Cso# 4- Meadow Street - Combined - Third base ball field
|
|
|
08/07/2021
|
|
|
08/07/2021
|
|
|
03:53 pm to 04:13 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
28171
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
James Rotondo, Comissioner Of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm that fell at a maximum rate of 0.87 inches/hour, and with a total of 0.48 inches on 8/7/21 resulted in the discharge of a combination of sewage and stormwater from Cso# 3 - School Street & Cso # 4- Meadow Street - Combined- Third Base, Ball Field. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPA-TEHQ-Q1JV4
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|