Facility Name:
|
Rutland
|
|
|
Tyler Harte
|
|
|
City of Rutland
|
|
|
Cso #-2 Home plate Ball Field
|
|
|
08/07/2021
|
|
|
08/07/2021
|
|
|
04:03 pm to 04:18 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
11888
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
James Rotondo, Commissioner of public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm that fell at a maximum rate of 0.87 inches/hour, and with a total of 0.48 inches on 8/7/21 resulted in the discharge of a combination of sewage and stormwater from Cso #2- Home Plate, Ball field . This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPA-TEDK-C7C3F
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|