Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Rutland    
Tyler Harte, Lab Technician    
City of Rutland    
Cso #1 Calvary Cemetery    
08/07/2021    
08/07/2021    
04:00 pm to 05:02 pm    
   
Authorized Wet Weather CSO Overflow    
82308    
High Flows    
none    
Combined sewer overflow structure    
None    
Otter Creek    
James Rotondo, Commissioner of Public Works    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm that fell at a maximum rate of 0.87 inches/hour, and with a total of 0.48 inches on 8/7/21 resulted in the discharge of a combination of sewage and stormwater from CSO #1- Calvary Cemetery . This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HPA-TE2X-83B8G