Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab. Director
|
|
|
City of Rutland
|
|
|
CSO # 5 - West Street Siphon
|
|
|
06/14/2021
|
|
|
06/14/2021
|
|
|
05:08 am to 05:53 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
17,768
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
James Rotondo, Interim Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by heavy rain that fell at a peak rate of 0.15 inches per hour, and a total accumulation of 0.38 inches on 6/14/2021 resulted in the discharge of a combination of sewage and stormwater from CSO # 5 - West Street Siphon. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HP9-FCJJ-9XGYQ
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|