Facility Name:
|
Rutland
|
|
|
Tyler Harte Lab Technician
|
|
|
City of Rutland
|
|
|
Cso # 1
|
|
|
05/05/2021
|
|
|
05/06/2021
|
|
|
08:39 pm to 04:06 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
686651
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Otter Creek
|
|
|
Jim Rotondo, interim Comissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by a steady rainfall that peaked at a rate of 0.19 inches per hour, and with a total accumulation of 0.68 inches on 5/5/2021 resulted in the discharge of a combination of sewage and stormwater from CSO # 1- Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|