|
Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab. Director
|
|
|
City of Rutland
|
|
|
CSO # 1 - Calvary Cemetery
|
|
|
04/29/2021
|
|
|
04/29/2021
|
|
|
09:20 pm to 10:17 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
47,433 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Jim Rotondo, Interim Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by heavy rain that fell at a rate of 0.19 inches per hour and a total accumulation of 0.79 inches on 4/29/2021 resulted in the discharge of a combination of sewage and stormwater from CSO # 1 - Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HP8-BV7Y-VZMA6
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|