Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab Director
|
|
|
City of Rutland
|
|
|
Where River Street Pump Station's Force Main piping crosses under Otter Creek
|
|
|
03/26/2021
|
|
|
03/26/2021
|
|
|
03:45 pm to 05:00 pm
|
|
|
|
|
|
Other
|
|
|
885,375 gallons
|
|
|
Crack/Hole in Pipe
|
|
|
No Known Obstruction in Force Main, Like
|
|
|
Crack/hole in pipe
|
|
|
Immediately, and within minutes of the problem being noticed, operators began the process of shutting off flow to the leaking force main and isolating it. All flow was then diverted to the other serviceable force main without delay. Once the leak had been stopped, all other necessary operational procedures and related contingency plans were followed and completed.
|
|
|
Otter Creek
|
|
|
James Rotondo, Interim Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Incident was likely caused by high flows moving through Wastewater Force Main during a heavy rain event. Nature of the wastewater flowing through the piping at that time consisted mainly of storm water. This ratio normally being 90 percent storm water and approximately 10 percent domestic wastewater.
|
|
|
|
|
|
HP7-H5GR-MSYS8
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|