|
Facility Name:
|
Rutland
|
|
|
Tyler Harte, Lab Technician
|
|
|
City of Rutland
|
|
|
Cso #5- West Street Siphon
|
|
|
11/30/2020
|
|
|
11/30/2020
|
|
|
06:55 pm to 07:13 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
2,694 Gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm, that fell at a rate of 1.17" per hour, with a total accumulation of 0.78" on 11-30-2020 resulted in the discharge of a combination of sewage and stormwater from Cso#5- West Street Siphon. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HP4-P73N-Z32JY
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|