Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab Director
|
|
|
City of Rutland
|
|
|
CSO # 1 - Calvary Cemetery
|
|
|
11/15/2020
|
|
|
11/15/2020
|
|
|
09:49 pm to 11:19 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
201,063 Gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Otter Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by heavy rain that fell at a rate of 0.56 inches per hour, with a total accumulation of 0.68 inches on 11/15/2020 resulted in the discharge of a combination of sewage and stormwater from CSO # 1 - Calvary Cemetery. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HP4-ADMD-NP7B2
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|