Facility Name:
|
Rutland
|
|
|
Mark Breznick / Lab. Director
|
|
|
City of Rutland
|
|
|
CSO #3 - School Street & CSO #4 Meadow Street - Combined - Third Base, Ball Fiel
|
|
|
09/30/2020
|
|
|
09/30/2020
|
|
|
01:30 am to 06:52 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
249,789 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
East Creek
|
|
|
Jeff Wennberg, Commissioner of Public Works
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by heavy rain that fell at a peak rate of 0.66 inches per hour with a total accumulation of 1.63 inches on 9/30/2020 resulted in the discharge of a combination of sewage and stormwater from CSO #3 - School Street & CSO #4 - Meadow Street - Combined - Third Base, Ball Field. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HP3-5G65-BSYNY
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|