|
Facility Name:
|
Rutland
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
Rutland
|
|
|
CSO #003 and #004 - Third Base
|
|
|
08/18/2020
|
|
|
08/18/2020
|
|
|
12:06 am to 12:29 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
15,910 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
Posting on social media
|
|
|
East Creek
|
|
|
Jeffrey Wennberg, Commissioner
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by last night’s rain storm resulted in the discharge of a combination of sewage and stormwater from CSO #003 and #004, Third Base. Rainfall came down at a rate of 1.24 inches per hour at one point. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HP2-3HH2-NYYV4
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|